Baku-Tbilisi train restores movement - UPDATED

Baku-Tbilisi train restores movement   - UPDATED
# 09 July 2019 01:46 (UTC +04:00)

The failure of the Baku-Tbilisi passenger train movement has been eliminated.

According to APA's local bureau, the repair work lasting approximately 2 hours has been completed and the train departs.

***01:03

Because of a malfunction on the power line, the passenger train stopped the Baku-Tbilisi train, APA reports citing the station.

A short circuit occurred in the electrical wires and the train stopped moving.

At present, repair work has begun on the site.

#
#

THE OPERATION IS BEING PERFORMED