Extension cost of TAP pipeline announced

Extension cost of TAP pipeline announced
# 29 August 2019 11:21 (UTC +04:00)

More than a billion euro funding will be needed for doubling the transmission capacity of Trans Adriatic Gas Pipeline (TAP), APA-Economics reports citing TAP consortium.

1035 million euro will be spent for the extension of power of the pipeline from 10 billion cubic meters to 20 billion cubic meters.

Four extension stages of the gas pipeline are indicated in the materials presented by the Consortium.

#
#

THE OPERATION IS BEING PERFORMED