Transportation of oil through the BTC pipeline increased to 9%

Transportation of oil through the BTC pipeline increased to 9%
# 12 August 2022 15:42 (UTC +04:00)

In January-July of this year, 20,935,300 tons of oil were transported through main oil pipelines in Azerbaijan, which is 2.8% more than the corresponding indicator of 2021, APA reports citing the State Statistics Committee.

79.1% of the transportation was carried out through the Baku-Tbilisi-Ceyhan (BTC) oil export pipeline, during the reporting period, 16,559 thousand tons of oil were transferred through the pipeline (as of 2021 8.6% more than the corresponding indicator).

#
#

THE OPERATION IS BEING PERFORMED