The construction of the Horadiz-Jabrayil-Zengilan-Aghband highway (Zengazur Corridor), which was founded by the presidents of Azerbaijan and Turkiye and has a length of 123.6 kilometers, is being rapidly continued, APA reports.
The highway was designed starting from Ahmadbayli village of Fuzuli and is being constructed according to international highway norms as technical grade I. The percentage of total completion of works on the project is 57%.