Azerbaijani president inaugurates Jangi-Badalli section of Baku-Shamakhi-Muganli highway

Azerbaijani president inaugurates Jangi-Badalli section of Baku-Shamakhi-Muganli highway
# 02 October 2017 08:31 (UTC +04:00)

Chairman of Azeravtoyol Open Joint Stock Company Saleh Mammadov informed the head of state of the works done under the project.

Jangi-Badalli section, which stretches from the 55th km to 101st km of Baku-Shamakhi-Mughanli highway, has been expanded to four lanes. The total length of this part of the highway is 46 km, while its width is 27.5 metres.

16 underground passages and six overground pedestrian crossings were built along the highway under the project.

A bridge measuring 47.5 metres in length and 30 metres in width was also built on the Jeyrankechmaz River along the road.

Jangi-Badalli section of Baku-Shamakhi-Mughanli highway underwent a major overhaul as part of the State Program on Socio-Economic Development of the Districts in 2014-2018 which was approved by the Azerbaijani President.

The head of state cut the ribbon symbolizing the opening of the highway.

#
#

THE OPERATION IS BEING PERFORMED