Asphalting of new highway bypassing Lachin city started-PHOTO

Asphalting of new highway bypassing Lachin city started-PHOTO
# 22 June 2022 17:17 (UTC +04:00)

Asphalting of new highway without entering the Lachin city has started, State Agency of Azerbaijan Automobile Roads told APA.

The length of the new highway is 32 km.

In accordance with the project, the width of the road that will be 3 lanes on the ascents and 2 lanes on the other sections, is 7-10.5 meters, width of the groundbed is 12-15 meters, and the width of the shoulder sections is 2x2.5 (5 m).

Currently, construction works are underway throughout the road.

1 2 3 4 5 İDMAN XƏBƏR
#
#

THE OPERATION IS BEING PERFORMED