Azerbaijan Railways CJSC plans to commission a railway from Laki to Gabala until end of this year. 82% of the construction works within the framework of the project have already been completed, Azerbaijan Railways told APA-Economics.
The single-track railway to Gabala starts from Laki station of Baku-Boyuk Kasik railway. The total length of the newly-constructed road is 44.5 km with sidetracks.