Aydin Karimov: “Heating system of Shusha is fully ready for winter”

Aydin Karimov: “Heating system of Shusha is fully ready for winter”
# 29 October 2021 11:38 (UTC +04:00)

“The heating system of Shusha is fully ready for winter,” Special Representative of the President of the Republic of Azerbaijan in Shusha district Aydin Karimov wrote on Twitter, APA reports.

“We together with Minister of Energy Parviz Shahbazov viewed Azeristiliktechizat's boiler rooms within the framework of preparations for winter in Shusha. In accordance with the relevant instructions of Mr. President, the main buildings and facilities of the city will be heated,” Anar Karimov noted.

#
#

THE OPERATION IS BEING PERFORMED