Highway in Ismayilli put into operation after reconstruction

Highway in Ismayilli put into operation after reconstruction
# 29 July 2020 11:57 (UTC +04:00)

Mughanli-Ismayilli (30 km) -Tazakand-Aghbulag-Goshakand highway (8 km) of Ismayilli district was put into operation after reconstruction, APA reports.

The President of the Republic of Azerbaijan Ilham Aliyev attended the opening ceremony.

The presentation of the Garamaryam-Ismayilli-Shaki (27 km) -Gushenja-Zoghallig highway was also held within the framework of the event.

#
#

THE OPERATION IS BEING PERFORMED