“Azeristiliktechizat” participates in restoration of energy infrastructure of Azerbaijan’s liberated territories

“Azeristiliktechizat” participates in restoration of energy infrastructure of Azerbaijan’s liberated territories
# 15 November 2022 12:18 (UTC +04:00)

“Azeristiliktechizat” OJSC also actively participates in the discussions of Master Plans and the preparations of proposals regarding the establishment of the heating infrastructure for the restoration and reestablishment of the energy structures in the liberated territories, said the acting chairman of “Azeristiliktechizat” Ilham Mirzaliyev at the briefing, APA-Economics reports.

According to him, in connection with the implementation of the Order of the President of Azerbaijan No. 2642 dated May 8, 2021, on “Measures regarding the development, construction, and installation of heating supply systems in Shusha”, the construction of 7 boiling rooms with a capacity of 8110 kW/h installed by "Azeristiliktechizat" OJSC in coordination with the Ministry of Energy and the President's special representative in Shusha district and the reconstruction of the heating and hot water supply systems of 16 buildings of various purposes have been completed and activated.

#
#

THE OPERATION IS BEING PERFORMED