A new 35 kW electricity line has been established in Lachin region, "Azerishig" OJSC told APA-Economics.
The existing airline from Gulabird area to the Lachin corridor has been restored.
A 35 kW line has been built in the direction of the newly built Gulabird-Minkend village using the "Gulabird" substation as a source.