The construction of the 81.6 km Ahmedbeyli-Fuzuli-Shusha highway connecting the liberated Fuzuli, Khojavend, Khojaly, and Shusha regions, starting from the M6 Hajigabul-Horadiz-Aghband-Zangazur highway, is r following international highway norms, APA reports.
APA informs that the Ahmadbeyli-Fuzuli-Shusha highway is constructed with 4-6 traffic lanes according to the 1st technical grade. Thus, the first 48 km of the road consists of six lanes, and the part between 48-81.6 km with four lanes. The width of the roadbed is 29.5 and 21.5 meters, respectively.